PureBallast 压载水处理
Ballast water system - System hero banner

UV ballast water treatment is effective and safe

UV is an effective and flexible solution in all aspects of ballast water treatment. Safe to handle and operate by the crew. No additives to the process that could harm the vessel or equipment onboard.

  • Inline construction and flexible design are suited to nearly any vessel
  • Single systems handle ballast water flows of 32-3000 m3/h
  • Multiple systems can be used for even larger capacities
  • Versatile vessel specific configurations

Our ballast water management system treatment solution

Ballast water treatment should be simple and safe. Alfa Laval PureBallast 3 is chemical-free, compact and easy to use, and it has the flexibility to meet your specific needs. 

system overview 3 white

System overview

PureBallast 3 combines initial filtration with enhanced UV treatment in a specially designed reactor.

  • UV for biological disinfection
  • Filtration
  • Integrated Cleaning-in-Place (CIP) unit 
  • Electric Cabinet and or lamp drive cabinet, and or Control cabinet
  • A broad range of auxiliary equipment available to support integration into any vessel including backflush pumps, sampling points, valve packages and remote-control panels.

Treatment technology 640x360.jpgUV for biological disinfection

The main treatment process, occurs within an enhanced UV reactor. The reactor has a flow-optimized interior that ensures high turbulence and the concentration of the UV dose.

The medium-pressure UV lamps within the reactor employ specially designed lamp sleeves of synthetic quartz. These unique sleeves support transmission of a broader wavelength spectrum and provide more UV light during disinfection. Combined with the reactor’s internal design, this ensures optimal UV dosage and low energy consumption.

Pureballast filtration.jpgFiltration

Supporting the reactor is a filter stage, used to remove any larger organisms and particles prior to biological disinfection. This improves the quality of water for treatment, especially when operating in cloudy coastal waters and fresh water.

In combination with the reactor, the effective basket filter design enables full-flow treatment of fresh, brackish and marine water with UV transmittance as low as 42%.

Operating the ballast water treatment system

PureBallast 3 performs in the background, running in IMO-regulated waters at just 50% of its potential operating power in most situations. It can be ramped up to full power for the most difficult operating scenarios.

Ballasting

The fully automated system ballasting process, when starting, it undergoes a brief start-up sequence. When ballasting begins, the incoming ballast water first passes through the filter stage. This removes any larger organisms and particles, which improves the quality of the water for treatment. The filter stage is of benefit for operation in cloudy coastal waters and fresh water. After filtration the water continues through the reactor stage, where it is disinfected by means of enhanced UV before entering the ballast water tanks.

Cleaning-In-Place (CIP)

Once ballasting is completed, the filter stage is filled with fresh water and a Cleaning-In-Place (CIP) cycle is prompted for the reactor stage. The CIP cycle should be performed within 30 hours. The reactor stage is rinsed with fresh water at the beginning of the CIP cycle and filled with fresh water upon its completion.

Deballasting

The deballasting process is the same as the ballasting process. However, the filter stage is bypassed during deballasting since the water has already been filtered. After leaving the ballast water tanks, the outgoing ballast water passes through the reactor stage to eliminate any regrowth of microorganisms that may have occurred in transit. Having thus been disinfected to the established limits, it is discharged into the receiving water at the deballasting site.

Alfa Laval PureBallast 3 ballast water management system matching your needs 

Our portfolio for deliveries before Q3, 2025

pureballast_compact_system640x360.jpgPureBallast 3 Compact

这是一种撬装式解决方案,适用于较小的压载水流量。由于占地面积小,管道最小化,因此安装非常简单。

压载水流量 32-300 立方米/小时

撬装式即插即用模块
灵活放置的电气柜

   

下载产品宣传册

PureBallast 3 Compact Flex

这是是大多数船舶的理想选择。它以散件形式交付,可最大限度地节省空间和提高安装灵活性

压载流量 32-1000 立方米/小时

  • 安装完全自由
  • 系统占用空间最小

 

 

下载产品宣传册

Alfa Laval PureBallast 3.jpgPureBallast 3 Std

在无危险环境的船舶上提供最广泛的反应器配置和技术机会。

压载流量 500-3000 m3/h

  • 最大范围的操作和部件布置
  • 双系统最高可达 6000 立方米/小时

 

 

下载产品宣传册

Alfa Laval PureBallast 3.jpgPureBallast 3 Ex

为爆炸环境下的船舶提供冗余安全功能和高度灵活性。电源可置于危险区域之外。

压载流量 250-3000 m3/h

  •   ATEX 和 IECEX。1 区、IIC 和 T4
  •   双系统最高可达 6000 m3/h

下载产品宣传册

PureBallast 3 Ex deckhouses for tankers

If your tanker uses submersible cargo pumps, you have maximum space for money-making cargo. But without a pump room, there’s no internal space for a ballast water treatment system. Alfa Laval PureBallast 3 Ex deckhouses make it easy to install on the weather deck, providing a complete, pre-assembled solution for tanker needs – including an integrated booster pump unit. Durable and purpose-designed, they safeguard compliance by protecting your PureBallast 3 Ex system throughout its lifetime.

deckhouse-vignette

Safety with PureBallast 3 Ex

PureBallast 3 Ex systems are available for flows of 250–3000 m3/h, with dual systems providing coverage for up to 6000 m3/h. They can be supplied in range of Ex configurations according to ATEX and IECEx, Zone 1, IIC and T4. Design is simplified by the flexible placement of the lamp drive cabinets, which can be located outside the hazardous zone and up to 150 m away from the reactors they serve.

Redundant safety features, such as the connection of the reactor temperature and level sensors via relays that bypass the PLC, increase safety in operation.

engineer wearing yellow safety equipment

Adapted flow for bulkers

If your vessel is a bulker, you probably load cargo at twice the rate you unload it. If so, you deballast at twice the speed of ballasting. That gives you an opportunity to save. A PureBallast 3 bulker-fit configuration adjusts the UV reactor and filter capacities, so that you install only what a bulker needs for compliance. Not only does it create a smaller system footprint, it also lowers your investment and operating costs.

Download leaflet

For engineering companies and installers

PureBallast 3 documentation for shipyards and other installing parties is divided into:

  • One part specific to installation issues, including “best practices”
  • One part with more thorough information for ongoing reference
  • Drawings and 3D models for easy incorporation into the design process

Direct assistance from Alfa Laval is also available to aid design and planning, as well as in the installation and commissioning processes.

Additional resources

Download Alfa Laval’s ballast water management resources to learn more about PureBallast 3 and how it compares to other available treatment technologies. To obtain design and installation documentation or more information, please contact Alfa Laval.